📍 Sweet Briar / Lithgow, NSW
Detailed design and construction of a new sewage pumping station to enhance local wastewater network capacity.
Design and construction of the sewage pumping station (SPS) including both gravity sewer and sewer rising main pipeline works.
📍Wilcannia, NSW
Full-scale design, construction, and commissioning of a 1.2 ML/d water treatment plant.
Net production capacity of 1.2 ML/d (based on 22 h/d). Scope covers construction and full site commissioning.
📍Port Hinchinbrook, QLD
Comprehensive mechanical and electrical upgrade of a critical sewage pump station, including specialized flow management.
Construction of a 2.1m diameter wet well, flow meter/valve pits, DN1200 manholes, and new concrete access. Includes installation of 2 submersible pumps, electrical switchboards, and specialized flow management converting existing SPS to a manhole.
📍 Hermidale, NSW
Modernization and capacity enhancement of the Hermidale sewer pumping facilities.
Construction and upgradation of the existing sewer pump station infrastructure to improve long-term reliability.
📍Dubbo, NSW
Major structural and mechanical upgrade works to modernize regional sewage pumping capabilities.
Construction of comprehensive upgrade works for the Troy Gully SPS to improve flow management and equipment efficiency.